EQUIPMENT CATEGORY

Walk-through screening

Consider how the equipment will work in the setting, not just how its specifications read.

Equipment and site arrangement.
Equipment and site arrangement.

STARTING POINT

Select around the passage, screening task and operating method.

Describe the task, the conditions and the expected handover so selection has a sound basis.

Prepare an enquiry

PROJECT NOTES

Make the scope specific.

01

Selection inputs

Prepare the passage location, environment, staffing and relevant item categories. State whether the installation is fixed or temporary, including transport and storage needs.

02

On-site review

Use the selected equipment’s installation instructions to check layout, power and surroundings. Agree test methods, samples and acceptance criteria before use.

03

Delivery scope

Identify the main unit, accessories, manuals and operating notes. Specify training, installation and maintenance separately. Website images are not model-specific.

Q & A

Before we start.

Why is there no model catalogue here?

Model selection should follow the task and site. We start with the requirement and then discuss suitable documentation and pricing.

LET’S TALK

Start with the setting.

The setting, existing equipment and timing give a project its starting point.

Prepare your brief