Tasks and timing first
List the examination setting, installation positions, commissioning window, operating period and removal schedule. Match each equipment requirement to a task.
EXAMINATION SUPPORT
Equipment arrival is one step. Preparation, operation and handover must fit the examination schedule.

STARTING POINT
Describe the task, the conditions and the expected handover so selection has a sound basis.
Prepare an enquiryPROJECT NOTES
List the examination setting, installation positions, commissioning window, operating period and removal schedule. Match each equipment requirement to a task.
Define entry screening, manual review, item storage and escalation separately. An equipment indication is not a final judgement about a person.
Hand over equipment and accessory lists, site-check records, instructions and support details. Agree system connections and radio-related requirements separately.
Q & A
No absolute detection promise is made. Capability depends on the documented equipment, conditions and on-site checks; staff review remains part of the process.
LET’S TALK
The setting, existing equipment and timing give a project its starting point.